
Analytics that begins with a baseline.
Pre-export AI control before the border, conversations read while they run, and measurement that compares the same signals before and after. ECLECTIE AG, Switzerland.
Two places it pays off.
Goods checked before they ship and conversations understood while they happen. Both are measured against the operation as it was.
Pre-export AI control
Goods, packaging, labels and documents are checked on the warehouse floor, before loading, routing and entry into the EU. Suppliers see the risk early instead of after a rejected shipment.
Conversation analysis
Every call is stored and searchable, and it is read while still running, down to whether the person on the other side behaves in line with the position they present. A qualified manager joins only the complex cases, with the context and a recommendation prepared.
Proof begins with a baseline.
We do not open with a heroic percentage. We agree what matters, observe the present operation, and compare the same signals once the system is working.
Response coverage
How much of the real demand receives a timely, useful response?
Cycle time
How long does work wait between an event and the next decision?
Manual hours
Where is expert attention spent on predictable preparation or transfer?
Cost exposure
What does delay, repetition or an unresolved exception put at risk?
Decision latency
How quickly can the right person reach a defensible next action?
The metric is chosen with the owner of the process. The source, the time window and the limitations stay visible.
Common questions.
Short answers, in the same terms the work is held to.
- What is pre-export AI control?
- A check made on the warehouse floor before goods leave: goods, packaging, labels and documents are reviewed before loading, routing and entry into the EU, so a supplier sees the risk before the border does.
- Which signals do you measure?
- The metric is chosen with the owner of the process: response coverage, cycle time, manual hours, cost exposure or decision latency. The source, the time window and the limitations stay visible.
- Do you promise a percentage improvement up front?
- No. We agree what matters, observe the present operation, and compare the same signals once the system is working. The number comes from the measurement, not from the pitch.

Write to the company.
Tell us what the operation is doing today and where it slows down.
- Applications
- Go to the application form


